Daniel’s Harbour Project

The Daniel’s Harbour Project, acquired through the RTO transaction with Altius Minerals in August 2018, is composed of a 100% interest in two licenses comprising 360 claims (~9,000 hectares) immediately adjacent to the closed Daniel’s Harbour Zinc Mine (produced ~7 Mt @7.8% zinc from 1975-1990). No significant exploration has been conducted in area for almost 30 years.

The MVT style mineralization has clear structural and stratigraphic controls; but no deep drilling has been completed to test obvious trends and favourable stratigraphy. There are sufficient untested parts of property to host significant resources located outside of mine site and four target areas have been identified which require further assessment with potential for follow-up drill testing.

 

  • Maps & Figures

Subscribe to our Email List